WP5 : International and interconnected numerical centre

  • Task 5.1: Design of numerical labs
  • Task 5.2: Tendering procedure
  • Task 5.3: Purchasing and installation. Labs are operational
  • Task 5.4: Interconnection and joint research strategy and topics